    I’ve had PM’s complain that our estimates don’t fit into their plan.

    I just walked away.

    • @[email protected]
      link
      fedilink
      33 months ago

      If the timing is critical then the only reasonable solution is to cut scope and features until it fits.

      The triangle isn’t a rubbery floppy thing, it is iron!

      • @deadbeef79000
        link
        13 months ago

        They fully subscribed to the mythical man month. So they just threw bodies at it and then couldn’t understand why the project got slower.

        • @[email protected]
          link
          fedilink
          23 months ago

          I don’t understand your statement. The Mythical Man Month teaches exactly that lesson of more bodies != Faster in many cases.

          How long to build the site with 1 full stack dev? 1.5 years.

          How long with an existing high performance team of 5? 2 months.

          How long if you hire 4 plus the one original (all qualified)? 1 to 1.5 years.

          How long if we hire 30 full stack devs? Maybe never.

          • @deadbeef79000
            link
            13 months ago

            Poorly worded on my part.

            They fully bought into the idea of the man-month without realising it was mythical.

            • @[email protected]
              link
              fedilink
              23 months ago

              You know? I literally figured that out a minute before I saw your reply. And I rolled my eyes at myself.

              That makes sense. Silly me

              Cheers