AT going next level. Muppets.

  • @thevoyagekayaking
    link
    44 months ago

    The works include rebuilding 840m of Meola Rd, half of which is being raised by about 400m over an old rubbish tip.

    Does nobody proof read this stuff?

    • @DaveMA
      link
      44 months ago

      I just assumed that section of the road needed to go over the top of the Sky Tower for some reason.