“I’m seeing a lot more of those ugly solar panels on roofs these days. So I wanted to show Australians what a nuclear-powered option looked like. You can hardly notice it at all"
It’s gone from being a project started in 2004 to build a 1650MWe plant costing 4.2 billion euros (in 2020 euros), to an estimated completion date of 2024, at 13.2 billion euros.
And this is France, a country that is very familiar and well-versed with building nuclear reactors.
Without the source document, this may well be the example you use from your 2nd bullet point. But I wouldn’t have called this a startup.
THEY FUCKING MISSED AN ENTIRE CLASS OF NUCLEAR REACTOR. They had one fucking job compare all the power options and they ignored any reactor that was not a small scallable bullshit silicon valley hyptrain piece of shit. This “unbiassed” report funded with million of dollars just happened to accidentally forget the cheapest and most economically efficient reactor design this is heigly sus and very much looks like it is purposefully misleading. I thought the CSIRO was unbiassed but this is an aggressiouse error that canot be overlooked.
I read the report then went and spoke to my engineering proffessor for nuclear engineering and confirmed that csiro where being dickheads. Why not include it anyways and still give that disclaimer and let the people judge still seems misleading to totally leave it out.
First there ars more large scale nuclear plants globaly bullshit we dont have a comparison. Second we dont know that they didnt run the numbers so we cant make the comparison.
Are you able to link the source document?
However, as an example of why nuclear is seen as risky, time-consuming and subject to massive cost blowout and time delays, see Flamanville 3 ( https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx Under “new nuclear capacity”)
It’s gone from being a project started in 2004 to build a 1650MWe plant costing 4.2 billion euros (in 2020 euros), to an estimated completion date of 2024, at 13.2 billion euros.
And this is France, a country that is very familiar and well-versed with building nuclear reactors.
Without the source document, this may well be the example you use from your 2nd bullet point. But I wouldn’t have called this a startup.
deleted by creator
THEY FUCKING MISSED AN ENTIRE CLASS OF NUCLEAR REACTOR. They had one fucking job compare all the power options and they ignored any reactor that was not a small scallable bullshit silicon valley hyptrain piece of shit. This “unbiassed” report funded with million of dollars just happened to accidentally forget the cheapest and most economically efficient reactor design this is heigly sus and very much looks like it is purposefully misleading. I thought the CSIRO was unbiassed but this is an aggressiouse error that canot be overlooked.
deleted by creator
I read the report then went and spoke to my engineering proffessor for nuclear engineering and confirmed that csiro where being dickheads. Why not include it anyways and still give that disclaimer and let the people judge still seems misleading to totally leave it out.
deleted by creator
First there ars more large scale nuclear plants globaly bullshit we dont have a comparison. Second we dont know that they didnt run the numbers so we cant make the comparison.
deleted by creator