    Makes me wonder if this is cheaper than refitting a train line with overhead wiring and if not possible, power rails.

    • Sonori
      link
      fedilink
      English
      93 months ago

      Almost certainly not, expanding 2.5 miles of additional catenary or especially third rail really isn’t going to have that much of a cost compared to specialized rolling stock. It’s also worth noting that the longer the route the less practical it is just down to the scale of battery needed and time it wastes charging.

      • waka
        link
        fedilink
        English
        43 months ago

        Well, trials are there for a reason. Battery-only-powered trains could be a good idea or a bad idea.

        Remember the trial project for overhead wiring for trucks on the motorway? It ran for a couple of years, and the end result was that it wasn’t feasible, despite some interesting benefits. But if it weren’t for the trial, some people would still think it was feasible, while others would think it was unfeasible.

        I’m leaning more on the unfeasible side with this train, but let’s just see what happens.

      • waka
        link
        fedilink
        English
        33 months ago

        Thanks, glimpsed over that line too fast. So durability concerns are most likely the limiting factor, hence the trial run. If, say, the battery can’t keep up wih continuously getting topped up and fails after a short time, it’s impractical/expensive. But could be the other way around as well.